Tunnel Furnace Specification Checklist
Checklist

Tunnel Furnace Specification Checklist

Key data for heating zones, residence time, conveyor layout and continuous production integration.

Calculate the production requirement

Line speed alone is not enough. Provide the product pitch, number of parallel lanes, process time and planned operating schedule so the heating length can be reviewed.

  • Parts per hour or web speed
  • Product pitch and orientation
  • Required heating and cooling time
  • Expected operating hours and changeovers

Describe the temperature profile

Identify the required product temperature, allowable heating rate, hold period and cooling conditions. Material sensitivity and any released vapors must also be stated.

Map the line interfaces

Share the factory layout and the height, direction, speed and signal requirements of connected equipment. Continuous systems are most effective when these interfaces are defined early.

Related Equipment

Products Referenced by This Guide

Browse all products
PET Preheating IR Tunnel Furnace ZKCO-RTR-10-6

Tunnel Furnaces · ZKCO-RTR-10-6

PET Preheating IR Tunnel Furnace

The ZKCO-RTR-10-6 preheats PET material using black ceramic long-wave infrared heating. Material travels through the heated section and then cools before collection; the furnace can also connect to unwinding and rewinding equipment.

View product

Have a process requirement or equipment specification?

Send the workpiece, operating conditions, target capacity and any available drawings for an initial configuration review.